Contact us  |  De  /  En  /  It

Jetzt Kontakt aufnehmen

WEBER ENTEC GMBH & CO. KG

Im Ermlisgrund 10
D-76337 Waldbronn

T +49 (0) 72 43/ 72 88 980
F ++49 (0) 72 43/ 76 55 011

mail@weber-entec.com

Or Contact Form
contact request successfully sent.

250 kW Biogas plant Vreden

250 kW Biogasanlage in Vreden

Background
The combined heat and power plant (CHP) was working at only 75% load (190 kW). The aim was to obtain a 100% load for the CHP. In addition, maize silage was to be successively replaced by more difficult substrates such as grass.

Result
Even just three months after commissioning the ultrasonic disintegration plant, the CHP achieved a load of 230 kW. In the meantime, the CHP is running at full load.