Kontakt  |  De  /  En  /  It

Jetzt Kontakt aufnehmen

oder Kontaktformular abschicken
Kontaktanfrage erfolgreich versendet.

WWTP in Moscow

Die Kläranlage verfolgte das Ziel, die Gasausbeute zu erhöhen ...

Background
The aim of the waste water treatment plant was to increase the gas yield as well as to reduce the amount of sludge and as a result of that the disposal costs.

Result
An independent laboratory experiment showed an increase of the gas yield of the surplus sludge up to 17%.