777 kW Biogas plant in Techentin
Background
The biogas plant had the aim to increase the gas production as well as to save substrate.
Result
After installing the ultrasound disintegration plant an efficiency increase of more than 22% was measured.
Jetzt Kontakt aufnehmen
Background
The biogas plant had the aim to increase the gas production as well as to save substrate.
Result
After installing the ultrasound disintegration plant an efficiency increase of more than 22% was measured.
Mal wieder ein nicht alltäglicher Aufbau. Bei dieser Anlage wurde extra ein Kran organisiert, da es durch das Dach des Pumpenraumes gehen musste. Aber am Ende Stand die Anlage.…
Background Aim was the maximum use of the rated power. Result The digester load could be increased, the rated power increases by 20%.
716 kW Bioenergiedorf Jühnde
275 kW Biogasanlage in Rastdorf
250 kW Biogasanlage in Vreden
Kläranlage in Baden-Württemberg
Biogasanlage in Bayern
800 kW Biogasanlage in Baden-Württemberg
1300 kW Biogasanlage in Niedersachsen
560 kW Biogasanlage in Freiburg/Elbe